Conversion of a barracks site into a campus
Miltenyi Biotec GmbH, Bergisch Gladbach
Miltenyi Biotec GmbH has its base on the site of a former NATO barracks. The aim is to establish a coherent campus from the existing and new buildings in the Bockenberg district of Bergisch Gladbach.
The course of the sloping terrain is largely maintained in the three above-ground parts of the new research and production facility; beneath the ground, the building is linked to the existing building.
This project was discussed in the network series “wieweiterarbeiten – Workspaces of the Future“.
Categories | Working |
Region | Nordrhein-Westfalen |
Developer | Miltenyi Biotec GmbH, Bergisch Gladbach |
Planning | Prof. Ulrich Coersmeier GmbH, Cologne; H.J. Komp Ingenieurbüro für Tragwerksplanung, Bergisch Gladbach |
Planning partners | PBR Planungsbüro Richter, Aachen; Ingenieurbüro Fischer (surveyor), Bergisch Gladbach; HTW-Ing.-GmbH (building services planning), Düsseldorf; Prof. Kramer (lighting design), Cologne; Isaplan Ingenieur (drainage, traffic, green roofs), Leverkusen |
Completion | 2007 |
Planning period | 2004-2007 |
Size / area | 12,444 m² |