Simple construction method for speedy erection of a production building
Kaufmann Holz AG, distribution centre, Bobingen









The focus was to erect a building that is specifically tailored to the production process and at the same time has a high degree of flexibility for future developments, and to do so for the developer in a short time by utilising a simple means of construction.
This project was presented in the network series “wieweiterarbeiten – Workspaces of the Future”.
Categories | Working |
Region | Bayern |
Developer | Kaufmann Holz AG, Bobingen |
Planning | Florian Nagler Architekten, Munich; Merz Kley Partner, Dornbirn (Austria) |
Completion | 1999 |
Size / area | 3,708 m² |
Building costs | 485 €/m² (cost groups 200–700) |